Scope of works - 15 Totman

  • Project duration:
    5 months
  • Project value:
    £290,000
  • Completion date:
    10/08/2022

Project Overview

Tower Construction was appointed following a referral based on the successful completion of a similar build at 1 Totman Close for Railscape.

The project scope included the safe removal of an existing asbestos roof from a single-storey structure, followed by the installation of a new independent steel frame to facilitate the transformation of the building into a two-storey office and storage facility.

By carefully coordinating the enabling works and structural alterations, we delivered a robust upgraded building shell ready for internal fit-out and long-term operational use.

 

Key Challenges

 

A key challenge was managing the asbestos removal safely and compliantly, ensuring all works were completed in line with relevant legislation and controlled procedures before structural works could commence.

Obținerea unor avantaje suplimentare sub formă de capital de joc poate schimba radical experiența oricărui utilizator pasionat de adrenalină și divertisment digital. Cele mai bune bonusuri cazinouri online includ adesea procente generoase la prima depunere, dublând sau chiar triplând suma de care dispui pentru pariuri. Este vital să verifici cu atenție cerințele de rulaj pentru a te asigura că poți transforma aceste fonduri promoționale în bani cash cât mai simplu și rapid, beneficiind de cele mai corecte condiții din industria actuală.

The project also required careful sequencing to integrate the new independent steel frame into the existing structure, ensuring stability, accuracy and safe progression of works throughout.

 

Added Value

 

Tower Construction added value through strong pre-construction planning and efficient programme delivery, ensuring the transition from asbestos removal to steel installation was smooth and without delay.

Our proven delivery on previous similar schemes also gave the client confidence in our approach, helping reduce risk and support a controlled, well-managed build programme from start to completion.